The 18 Street Bridge over Horsehills Creek will be replaced. Construction will begin in 2025.

The 18 Street Bridge over Horsehills Creek has reached the end of its service life and needs to be replaced. 

The original bridge will be replaced with a new, wider bridge that meets current roadway standards.

Design is currently underway, with construction anticipated for spring 2025. 

Project Area: 18 Street Bridge Replacement

Project Timeline

Project lifecycle design image

2024 

  • Design

2025

  • Construction